Aube.Tuesday, 24 November 2026Support us

Aube.

News of progress
DeployedSingle source

EVgo opens its first Tesla Supercharger stalls in Chicago

Languages for this article
Original · ENDEESFRITPT

Originally written in English. 6 languages available; yours is one click away.

Photo: Missoula (MT, USA), Tesla Supercharger -- 2022 -- 194228
Photo: Dietmar Rabich · CC BY-SA 4.0 · Wikimedia Commons

A grocery store parking lot in Chicago is now home to EVgo’s first Tesla Supercharger stalls. The site, at Riverside Square & River’s Edge on South Ashland Avenue, has 12 fast-charging stalls rated at 325 kW, and each one carries both NACS and CCS plugs. NACS is the connector format used by Tesla; CCS is the plug used by non-Tesla electric cars. It is the first of hundreds of Supercharger stalls EVgo plans to add across the US.

The key is a feature called Magic Dock. Both NACS and CCS vehicles can charge there without an adapter. A Tesla driver finds the station in the car’s navigation and Trip Planner, while a compatible non-Tesla electric car starts a session through the Tesla app. The roles are split: EVgo owns the Superchargers and brands them under its own name, and Tesla runs and maintains them.

The ambition goes beyond this one lot. EVgo’s August announcement cited up to 500 kW for the Supercharger rollout, and the Chicago stalls are rated at 325 kW, below that figure. The first sites after this one will be at Regency Centers shopping plazas that include grocery stores.

For drivers, the change is access. Since early September, other EVgo fast chargers with NACS plugs have appeared in Tesla navigation for drivers who turn on third-party charging. EVgo is also adding NACS plugs to its regular network, a rollout it began in 2025, and aims for 500 of those stalls across the US by the end of 2026, counted apart from Supercharger stalls. Over the next two years, it plans to put at least one NACS plug at every EVgo site built in 2023 or later. Badar Khan, EVgo’s CEO, says that serving both Tesla and non-Tesla NACS drivers is “doubling EVgo’s addressable market.”

What comes next is the spread: the Regency Centers sites, the hundreds of Supercharger stalls, and the 500 NACS stalls the company aims to have by the end of 2026.

325 kWper stall at EVgo’s first Tesla Supercharger site, in Chicago

Sources — read the originals(Paris time)

ElectrekEN
0000

Read next

Comments

Loading the thread…

Sign in to leave a comment. Sign in