Kawasaki delivers LNG supertanker cutting NOx by up to 85%

Kawasaki Heavy Industries delivered Tsurugidake in October, and the ship is large enough to hold 352,151 cubic meters of cargo. At 339.5 meters long, it is one of the biggest vessels afloat, and its maker says it is also one of the cleaner ones. The tanker was built at the Dalian COSCO KHI Ship Engineering shipyard in China and handed over to Sequoia Navigation Inc. on October 14, 2026.
The ship's engine is what changes the emissions picture. It is a seven-cylinder, two-stroke MAN B&W engine that can burn liquefied natural gas as well as low-sulfur fuel oil. When running on LNG, Kawasaki says it can reduce carbon dioxide by about 25% to 30% compared with conventional heavy-oil engines. The company also estimates that nitrogen oxide emissions can be cut by up to 85%, and that sulfur oxides can be eliminated entirely.
Sulfur is removed by scrubbers, installed on the main engine's exhaust outlet and on the onboard power-generation system. They strip sulfur oxides from the exhaust, which lets the ship burn fuel oil and still meet emission limits. Kawasaki says the design also meets Phase 3 of the International Maritime Organization's Energy Efficiency Design Index (EEDI), which requires new ships to reach a 30% improvement in design energy efficiency over the original baseline. The hull is a second lever. The conventional bulbous bow at the front of tankers has been replaced by a new bow form that lengthens the vessel at the waterline, which Kawasaki says reduces wave-making resistance and improves propulsion.
For operators moving crude over long distances, the gain is measured voyage by voyage: less fuel burned, less sulfur released, and fuel-oil costs that Kawasaki expects to fall, since conventional fuel oil remains usable after tighter rules take effect. The company gives no figure for that saving. The engine is designed to run efficiently at low speed, and the large-diameter propeller is meant to cut fuel use further. The ship is the fourth LNG-fuelled very large crude carrier the Kawasaki group has delivered, so the design is now in use beyond a single prototype.
Sources — read the originals(Paris time)
Read next
Comments
Loading the thread…
Sign in to leave a comment. Sign in