Laser scans and AI help judge damaged steel towers

Electrical transmission towers stand in remote Swiss areas, and after a snowstorm they can be hard to reach. Today, the people who check them climb, look and write a report. A new method from EPFL, the Swiss university, aims to give those inspectors a second, measured opinion. Dimitrios Lignos, a professor at its Resilient Steel Structures Laboratory, and his team describe it in the journal Computers and Structures, in a 2026 paper led by Tianyu Gu.
The method starts with detailed 3D scans of a structure made with laser technology. The scans capture the geometry of each element and any visible deformation. The measured points are then processed with point-cloud techniques, and algorithms analyze them. Those algorithms were trained on thousands of laboratory experiments, supplemented by virtual test samples checked against physics-based simulations. The system estimates how much load a damaged element can still safely withstand, and whether it can keep working as intended or needs intervention. The method also accounts for measurement noise, which comes from scan resolution and weather, and shows how much that uncertainty affects the final assessment.
Lignos is explicit about the role of the tool. "The methodological developments do not attempt to replace human inspectors but to guide them to make more informed decisions," he says. The researchers focused first on electrical transmission towers and on infrastructure built from standardized steel profiles. The framework could extend to conventional steel buildings, steel-concrete composite bridges and railway infrastructure, and could help decide whether decommissioned components can be safely reused. A separate project, with Olga Fink's laboratory, aims at predictive algorithms that would identify reusable members at the end of their service life.
The work is still at laboratory stage. The team is looking for pilot projects to move the technology into everyday infrastructure management, and the feedback of inspection companies will refine the workflow before any commercial launch. Lignos and his colleagues, with Alcherio Martinoli's laboratory, have also explored drones to reach structures in remote places or those that are dangerous for people to approach. No calendar for these steps has been announced.
For an inspection company or a utility, the gain would be fewer risky climbs, a more uniform assessment from one inspector to the next, and a clear statement of how confident the result is. The timing depends on the pilot projects now being sought. Until then, the method remains a research framework tested on laboratory data.
Sources — read the originals(Paris time)
Pages consulted while writing
Read next
Comments
Loading the thread…
Sign in to leave a comment. Sign in